Work carried out in real production conditions.

The context, observations, technical decisions and work carried out. These case studies show how OMNIATEC approaches industrial problems on site.

Client case · Production stopped · Controls rebuilt in summer 2026

GRECON Type 2004: rebuild the controls, retain the mechanics.

Failed logic boards at the heart of the system could not be repaired, leaving the client unable to produce. OMNIATEC rebuilt the controls with WAGO / CODESYS while retaining the mechanical base.

Illustration of a GRECON Type 2004 timber saw with pressure rollers and cut pieces leaving on the right.

Typical situations

On-site work in Alsace and Baden-Württemberg

Based in Scherwiller, near Sélestat in Alsace, OMNIATEC works at industrial sites in Alsace and Baden-Württemberg. Travel is arranged to suit each assignment, including sites around Strasbourg, Colmar, Mulhouse, Freiburg, Offenburg, Karlsruhe and Stuttgart. Working languages: French, German and English.

Tell us where the site is, which equipment or operation is involved and what is holding production back. The first discussion establishes the need; on-site diagnostics and engineering studies are quoted separately.